Size
Man Size Chart | S | M | L | XL | 2XL | 3XL |
Chest(CM) | 49 | 51 | 53 | 55 | 57 | 59 |
Length(CM) | 67 | 69 | 71 | 73 | 75 | 77 |
Shoulder(CM) | 44 | 45.5 | 47 | 48.5 | 50 | 51.5 |
Sleeve(CM) | 18.9 | 19.7 | 20.5 | 21.3 | 22.1 | 22.9 |
Specification
- 100% polyester, single jersey
- 150gsm
- Crew neck with Rib
- Cotton elastane rib bottom and cuffs
- Shrot sleeves
- Dropped, shaped hem for enhanced coverage
- Rolled forward topstitched shoulder
- Double needle sleeve and bottom hems
- Regular fit
Additional Details
- Recommended care instructions - machine wash cold with like colors
- Line dry or tumble dry low
FAQ
1. What is your MOQ? Normally the 3D printed t shirts’ MOQ is 1000pcs/design. 2.Can we customize the full print? Yes, we can customize your design in AI or PDF file. 2.How long is the sample lead time? For existing sample, it takes 2-3 days. If you want your own designs, it takes 5-7 days including tie dyed process as well as print or embroidery if there is. Anyway, we will response fast to your request. 3.What about our bulk production lead time? Normally It will takes 30 days for MOQ after confirmation of pre-production samples. Our production capacity is 200,000pcs per month. 4.How to place order? Please send us your inquiry with fabric requirements, artwork, size-specification etc. We can quote you the price, then develop fitting samples, and place bulk orders. 5.What is your payment term? 30% TT advanced payment and 70% TT before delivering out from our factory. L/C at sight for large amount for certain countries accepted.SERVICE
- We provide sample making service before placing bulk orders
- OEM and ODM available
- 200,000pcs per month mass production capacity
- Fast sample making
- English-speaking sales team and after-sales service makes communication more convenient.
- Our contact methods including but not only emails, whatsapp, skype, phone, zoom meeting, etc.
- We can send the mass production schedule, photos, video even live streaming during the orders proceeding if clients need, so you can know well about the production situation at all the steps.